Timeframe | Equipment | Manager | Review |
---|---|---|---|
Timeframe:
1998 - 2002
| Equipment:
| Review:
original build
| |
Timeframe:
2002
| Equipment:
| Manager:
| Review:
sold and renamed
|
Extended dredging pipe installation is removed during drydocking 2009. Max. dredging depth is 35 m.