Timeframe | Equipment | Manager | Review |
---|---|---|---|
Review:
--
|
7000 t
Each vessel will feature a MAN 6L32/44CR and a 9L32/44CR engine with the latest, flexible, common-rail technology. One of the engines will be dedicated to driving a CPP, as well as a mechanical dredge pump, and is designed to satisfy its demands for constant torque and reliable performance under different operational conditions. The engines will be delivered SCR-ready so as to readily accommodate any retrofit should Tier III operation be requested in the future. The propulsion packages also include an MAN Alpha Twin screw CP propeller plant – type VBS720-ODF – with AHT nozzles, as well as two MAN Renk RSLV-720 gearboxes. Shipment of both shipsets is scheduled for the turn of 2017/18.